AHMADI, Ahmadi et al. TIME SCHEDULING AND COST OF THE INDONESIAN NAVY SHIP DEVELOPMENT PROJECT USING NETWORK DIAGRAM AND EARNED VALUE METHOD (EVM) (CASE STUDY OF FAST MISSILE BOAT DEVELOPMENT). JOURNAL ASRO, [S.l.], v. 9, n. 2, p. 87-106, nov. 2018. ISSN 2722-5763. Available at: <https://asrojournal-sttal.ac.id/index.php/ASRO/article/view/80>. Date accessed: 03 july 2024. doi: https://doi.org/10.37875/asro.v9i2.80.
asiabet118
ratuking4d
https://ricos-lechon.com/
https://pilarmedia.id/-/dolantogel/
https://theescapegoat.com/
situs slot maxwin
asiabet118