SUTRISNO, Sutrisno; AHMADI, Ahmadi; S SUHARYO, Okol. THE OPTIMIZATION OF MULTIPURPOSE BUILDING DEVELOPMENT ON PROJECT SCHEDULING USING PRECEDENCE DIAGRAM METHOD (PDM). JOURNAL ASRO, [S.l.], v. 9, n. 1, p. 1-7, jan. 2018. ISSN 2722-5763. Available at: <https://asrojournal-sttal.ac.id/index.php/ASRO/article/view/46>. Date accessed: 03 july 2024. doi: https://doi.org/10.37875/asro.v9i1.46.
asiabet118
ratuking4d
https://ricos-lechon.com/
https://pilarmedia.id/-/dolantogel/
https://theescapegoat.com/
situs slot maxwin
asiabet118