DETERMINING THE FIRST PRIORITY OF THE FIRST ARSENAL LOCATION TO SUPPORT THE OPERATION OF THE INDONESIAN WAR SHIP IN SECURITY OF THE EASTERN INDONESIAN SEA REGION WITH AHP METHODS

  • I Nengah Putra A Indonesia Defense University Unhan
  • Sukmo Hadi Nugroho Universitas Esa Unggul
  • Okol Sri Suharyo STTAL
  • Cahyanto Cahyanto STTAL

Abstract

Faced with conditions of life of the nation that continues to evolve into a multidimensional cover all areas of life
of the nation, then certainly required the development and deployment of the total potential and power of the
nation effectively. Therefore it is the power that was developed to deal with these threats must also have the
ability to multi-dimensional as well. Reality is always pushing to restructure the military concept of defense to
become responsive and adaptable and tailored to the substance of the reforms in the defense. The main
problem faced by Indonesia to develop a domestic defense industry is the inability of industry and education
sectors to absorb the fundamental aspects of the Revolution in Military Affairs (RMA). This inability does not
allow Indonesia to experience significant breakthroughs in the application of RMA. So with reference to the
condition necessary to anticipate concrete steps in developing a systematic plan to build the defense industries
are able to anticipate the revolution in military affairs. Among priorities at once by selecting the appropriate
stages of the development plan which includes the development of Main Equipment Weapon System, Spatial
Planning Area Defense, Civil Defense Development, and Spatial Structure of the Organization. And one of its
efforts is the creation of the ability of military logistics support system effective and efficient and responsive,
which in this case is the development of Arsenal's arsenal of weapons and ammunition in terms of both quality
and quantity so that is always ready to face any condition of any contingency that would happen. Determining
policy location Arsenal first location contains more choices in environmental issues multiobjectiv and
multicriteria decision, then the model is proposed to be the appropriate methodology to accommodate the
qualitative preference and priority-setting objectives / criteria for future development is to approach the
Analytical Hierarchy Process (AHP). Principle of the AHP method is to break breaking a complex situation and
unstructured, into its component parts, arranging these variables in a section or an order of hierarchy, giving
numerical values to subjective considerations about the relative importance of each variable and analysis
various considerations is to determine which variables have highest priority and act to influence the outcome of
the situation. From the results of the solution by using AHP method showed that the first priority location
determination Arsenal 1 in the eastern region is a factor analysis of logistics operations to support operations
capabilities in integrated logistics support system that effectively and efficiently. And the locations selected for
Arsenal's first priority location is in the eastern region Lantamal Ambon.


Keyword: Determining location - Approach of the Analytical Hierarchy Process (AHP)

Published
2020-01-31
How to Cite
A, I Nengah Putra et al. DETERMINING THE FIRST PRIORITY OF THE FIRST ARSENAL LOCATION TO SUPPORT THE OPERATION OF THE INDONESIAN WAR SHIP IN SECURITY OF THE EASTERN INDONESIAN SEA REGION WITH AHP METHODS. JOURNAL ASRO, [S.l.], v. 11, n. 1, p. 112-122, jan. 2020. ISSN 2722-5763. Available at: <http://asrojournal-sttal.ac.id/index.php/ASRO/article/view/208>. Date accessed: 28 mar. 2024. doi: https://doi.org/10.37875/asro.v11i1.208.
Keywords:
Determining location - Approach of the Analytical Hierarchy Process (AHP)