Ahmadi, A., Suparno, S., S Suharyo, O., & Susanto, A. (2018). TIME SCHEDULING AND COST OF THE INDONESIAN NAVY SHIP DEVELOPMENT PROJECT USING NETWORK DIAGRAM AND EARNED VALUE METHOD (EVM) (CASE STUDY OF FAST MISSILE BOAT DEVELOPMENT). JOURNAL ASRO, 9(2), 87-106. doi:10.37875/asro.v9i2.80